Assembly guide¶
The detailed assembly workflow currently lives in the interactive SOP:
Open the interactive BEATBox Assembly SOP
Assembly stages¶
Prepare printed parts and insert seats.
Build the base and feet.
Build wall panels and place them directly in the frame.
Install door hardware.
Assemble modules: screen, light, tunnel, and feeder.
Wire modules to the master electronics.
Complete final geometry, safety, and cable checks.
Notes to migrate here¶
The Sphinx documentation should eventually include a stable, versioned assembly guide that mirrors the interactive SOP while keeping the interactive checklist available for bench work.