Beatbox Assembly Tutorials¶
Follow these guides in numerical order to build the enclosure and its sub-modules.
Assembly sequence¶
Step |
Tutorial |
What to complete |
|---|---|---|
1 |
Build the base, pillars, walls, and door. Leave module installation and the top-panel closure until Steps 2–6 are complete. |
|
2 |
Build and prepare the water bottle mount for attachment to the enclosure. |
|
3 |
Build the feeder housing, electronics, motor, and rotor. |
|
4 |
Build the light ring housing, PCB, cap, and diffuser. |
|
5 |
Build the photobeam gate, IR boards, controller, cabling, and covers. |
|
6 |
Build both touchscreen housings, controller PCBs, IR boards, and cabling. |
|
7 |
Install the completed modules, position the photobeam gate, complete the final checks, and secure the top panel. |
Steps 1 and 7 use the same enclosure guide: Step 1 prepares the structure, and Step 7 completes the integration after all sub-modules are ready.
For parts and quantities, see the bill of materials.